draining toons
Posted: Wed Jun 10, 2009 1:45 pm
I know this has been been covered but I am having a hard time finding a solution to my particular issues so hopefully you guys can help... I have a few cracks in need of repair and am having a heck of a time trying to find an aluminum welder in my area but that's another issue all together. What I need to find out is the best way to go about draining the water that is in there before I have it welded. According to my research, my toons are compartmentalized at each vertical weld (97 PartiKraft w/ round tubes) which makes sense and I want to be able drain the entire tube so my question is..would I have to install drains on the bottom of each section? I would assume this is the case but I also found this quote in a previous post...
'If they are round logs, they will be compartmentalized. If U tubes, they should be foam filled. I put rear drain plugs in a previous toon by drilling a 1/2 inch hole at the bottom rear of the log and used snap bailer plugs. Simple and it works great. Easy to remove for quick draining too..'
^^maybe this was for the U tubes? Also I dont know how mounting plugs on the very bottom would not interfere with the trailer bunks. Seems like they would get torn off...
'If they are round logs, they will be compartmentalized. If U tubes, they should be foam filled. I put rear drain plugs in a previous toon by drilling a 1/2 inch hole at the bottom rear of the log and used snap bailer plugs. Simple and it works great. Easy to remove for quick draining too..'
^^maybe this was for the U tubes? Also I dont know how mounting plugs on the very bottom would not interfere with the trailer bunks. Seems like they would get torn off...