I tinkered with the boat a bit today, I have been working on a mount for the controls so I could mount them on the correct (starboard) side of the console, but after battling it I decided to just mount them on the port side. I know it not the correct way but I'm left handed and I'm selling it so if it's a problem for the new owner he can buy the correct controles for the other side.. I also mounted my rod holders on the console. Nothing real major but still progress. Here's some pics
Here's a list of what I can think of that needs to be done to finish the boat
1-I need two of the bases the anchor and nav lights plug into
2-gauges, tach fuel and volt
3-vent hose for the fuel tank and vent
4-cooler cushion for seat In front of console
5-build a floor for the batteries
6- make some storage room
7-bolt down floor
8-rebuild carbs
9-finish painting interior walls and gunnels
10-fish it until it sells
Ryan, Martha, Ana and Nathan Toler.
(SOLD)1992 24' monark sun spa 240 1996 (rebuilt) Johnson 112
2014 South Bay chassis (IN THE WORKS)
2006 dodge ram quad cab
Crosby Texas