Lower unit off time to order the new one
Moderators: Redneck_Randy, badmoonrising, lakerunner
- curtiscapk
- Posts: 5445
- Joined: Mon Nov 10, 2008 8:31 am
- Location: OP KS\Hillsdale Lake
Lower unit off time to order the new one
So we got the l.u. off and suprised to find out it is a short shaft....
Maybe since it is a 94 the weren't putting long ones on toons...
Waiting to hear back from SEI on replacement.
Maybe since it is a 94 the weren't putting long ones on toons...
Waiting to hear back from SEI on replacement.
- Attachments
-
- IMAG0261.jpg (65.76 KiB) Viewed 4103 times
-
- IMAG0260.jpg (82.08 KiB) Viewed 4103 times
Last edited by curtiscapk on Mon Apr 11, 2011 9:48 am, edited 1 time in total.
Craig and Paula
"THE FLOATER" rebuild Spring 2013
viewtopic.php?f=2&t=15328
94 Party Barge 24' 115 merc
Turning Point hustler 14 x 13 prop
22mph gps 3 people
12 F150
Overland Park Ks
Hillsdale Lake, KS
"THE FLOATER" rebuild Spring 2013
viewtopic.php?f=2&t=15328
94 Party Barge 24' 115 merc
Turning Point hustler 14 x 13 prop
22mph gps 3 people
12 F150
Overland Park Ks
Hillsdale Lake, KS
Re: Lower unit off time to order the new one
Mabe that means that the short unit will save you a few bucks in relpacement. 
"Nauti Weasel"
2005 Beachcomber Islander 26
2005 Beachcomber Islander 26
- curtiscapk
- Posts: 5445
- Joined: Mon Nov 10, 2008 8:31 am
- Location: OP KS\Hillsdale Lake
Re: Lower unit off time to order the new one
Nope all the same 845.00.
I will tell you what that sucker came off in 30 minutes. If any of you are worried about replacing impeller,. It was five nuts and almost didn't catch it when I gave it a smack.
I will tell you what that sucker came off in 30 minutes. If any of you are worried about replacing impeller,. It was five nuts and almost didn't catch it when I gave it a smack.
Craig and Paula
"THE FLOATER" rebuild Spring 2013
viewtopic.php?f=2&t=15328
94 Party Barge 24' 115 merc
Turning Point hustler 14 x 13 prop
22mph gps 3 people
12 F150
Overland Park Ks
Hillsdale Lake, KS
"THE FLOATER" rebuild Spring 2013
viewtopic.php?f=2&t=15328
94 Party Barge 24' 115 merc
Turning Point hustler 14 x 13 prop
22mph gps 3 people
12 F150
Overland Park Ks
Hillsdale Lake, KS
Re: Lower unit off time to order the new one
I'm sure that pink tool box helped you gather the strenth to lift it though right?
I will be relpacing my impeller probably at the beginning of next season, and have a saved youtube video for help.
I will be relpacing my impeller probably at the beginning of next season, and have a saved youtube video for help.
"Nauti Weasel"
2005 Beachcomber Islander 26
2005 Beachcomber Islander 26
- curtiscapk
- Posts: 5445
- Joined: Mon Nov 10, 2008 8:31 am
- Location: OP KS\Hillsdale Lake
Re: Lower unit off time to order the new one
I just knew when I took those freakin pics someone gonna give me shit for my pink tool box....

Craig and Paula
"THE FLOATER" rebuild Spring 2013
viewtopic.php?f=2&t=15328
94 Party Barge 24' 115 merc
Turning Point hustler 14 x 13 prop
22mph gps 3 people
12 F150
Overland Park Ks
Hillsdale Lake, KS
"THE FLOATER" rebuild Spring 2013
viewtopic.php?f=2&t=15328
94 Party Barge 24' 115 merc
Turning Point hustler 14 x 13 prop
22mph gps 3 people
12 F150
Overland Park Ks
Hillsdale Lake, KS
Re: Lower unit off time to order the new one
You set yourself up on that one Curtis.
Hopefully you get that think back to gether soon. With this 90+ degree weather we've been having, that water will warm up quickly, and be ready for some swimming & drinking.

Hopefully you get that think back to gether soon. With this 90+ degree weather we've been having, that water will warm up quickly, and be ready for some swimming & drinking.
"Nauti Weasel"
2005 Beachcomber Islander 26
2005 Beachcomber Islander 26
- curtiscapk
- Posts: 5445
- Joined: Mon Nov 10, 2008 8:31 am
- Location: OP KS\Hillsdale Lake
Re: Lower unit off time to order the new one
Man it was great down at the lake we got so much done....
LU taken off.
Distribution box put in no more pvc over road with shower power hooked to main box.
Leaves burnt.
All 4 wheelers running great.
and 60 this weekend crap....
LU taken off.
Distribution box put in no more pvc over road with shower power hooked to main box.
Leaves burnt.
All 4 wheelers running great.
and 60 this weekend crap....
- Attachments
-
- DSCN3783a.JPG (78.27 KiB) Viewed 4038 times
-
- DSCN3786a.JPG (81.11 KiB) Viewed 4035 times
-
- IMAG0253a.jpg (112.41 KiB) Viewed 4034 times
-
- IMAG0250a.jpg (129.23 KiB) Viewed 4043 times
Craig and Paula
"THE FLOATER" rebuild Spring 2013
viewtopic.php?f=2&t=15328
94 Party Barge 24' 115 merc
Turning Point hustler 14 x 13 prop
22mph gps 3 people
12 F150
Overland Park Ks
Hillsdale Lake, KS
"THE FLOATER" rebuild Spring 2013
viewtopic.php?f=2&t=15328
94 Party Barge 24' 115 merc
Turning Point hustler 14 x 13 prop
22mph gps 3 people
12 F150
Overland Park Ks
Hillsdale Lake, KS
- curtiscapk
- Posts: 5445
- Joined: Mon Nov 10, 2008 8:31 am
- Location: OP KS\Hillsdale Lake
Re: Lower unit off time to order the new one
Well don't this suck
Based on the serial number you provided, I believe your unit is the 3-jaw reverse clutch style. Ours is the upgraded 6-jaw reverse clutch and the only way you could use our lower is if you replaced the shift shaft which would require you to remove the power head. The 12 is referring to the number of teeth on the pinion gear not the splines on the driveshaft.
Thank you for contacting SEI.
Based on the serial number you provided, I believe your unit is the 3-jaw reverse clutch style. Ours is the upgraded 6-jaw reverse clutch and the only way you could use our lower is if you replaced the shift shaft which would require you to remove the power head. The 12 is referring to the number of teeth on the pinion gear not the splines on the driveshaft.
Thank you for contacting SEI.
Craig and Paula
"THE FLOATER" rebuild Spring 2013
viewtopic.php?f=2&t=15328
94 Party Barge 24' 115 merc
Turning Point hustler 14 x 13 prop
22mph gps 3 people
12 F150
Overland Park Ks
Hillsdale Lake, KS
"THE FLOATER" rebuild Spring 2013
viewtopic.php?f=2&t=15328
94 Party Barge 24' 115 merc
Turning Point hustler 14 x 13 prop
22mph gps 3 people
12 F150
Overland Park Ks
Hillsdale Lake, KS
Re: Lower unit off time to order the new one
That does suck...
I guess you could B ust O ut A nother T housand and just buy a new to you motor instead... and sell your's for parts. Should be a descent selection dowm by Truman / LOTO.
I guess you could B ust O ut A nother T housand and just buy a new to you motor instead... and sell your's for parts. Should be a descent selection dowm by Truman / LOTO.
"Nauti Weasel"
2005 Beachcomber Islander 26
2005 Beachcomber Islander 26
- curtiscapk
- Posts: 5445
- Joined: Mon Nov 10, 2008 8:31 am
- Location: OP KS\Hillsdale Lake
Re: Lower unit off time to order the new one
shit we doing good just to afford the Thousand now....
I am still looking for shift shaft.
I am still looking for shift shaft.
Craig and Paula
"THE FLOATER" rebuild Spring 2013
viewtopic.php?f=2&t=15328
94 Party Barge 24' 115 merc
Turning Point hustler 14 x 13 prop
22mph gps 3 people
12 F150
Overland Park Ks
Hillsdale Lake, KS
"THE FLOATER" rebuild Spring 2013
viewtopic.php?f=2&t=15328
94 Party Barge 24' 115 merc
Turning Point hustler 14 x 13 prop
22mph gps 3 people
12 F150
Overland Park Ks
Hillsdale Lake, KS
Re: Lower unit off time to order the new one
They prob fed you that line of crap after seeing the pink toolbox...curtiscapk wrote:I just knew when I took those freakin pics someone gonna give me shit for my pink tool box....![]()
![]()
--------------------



--------------------
'07 22 ft SunTracker Regency 135hp i/o
'02 Dodge 2500, Edge Juice w/Attitude
Colorado Springs, CO.



--------------------
'07 22 ft SunTracker Regency 135hp i/o
'02 Dodge 2500, Edge Juice w/Attitude
Colorado Springs, CO.
- curtiscapk
- Posts: 5445
- Joined: Mon Nov 10, 2008 8:31 am
- Location: OP KS\Hillsdale Lake
Re: Lower unit off time to order the new one
so my local mercury service marine ( thats 40 miles from closest lake!) says he will look at the old one for 50 bucks he said it sounded like a pin may have sheared. To install the new 200 dollar shift shaft you have to pull the powerhead. CRAP! So I think I'll take it in to him and see how bad it really is. 
Craig and Paula
"THE FLOATER" rebuild Spring 2013
viewtopic.php?f=2&t=15328
94 Party Barge 24' 115 merc
Turning Point hustler 14 x 13 prop
22mph gps 3 people
12 F150
Overland Park Ks
Hillsdale Lake, KS
"THE FLOATER" rebuild Spring 2013
viewtopic.php?f=2&t=15328
94 Party Barge 24' 115 merc
Turning Point hustler 14 x 13 prop
22mph gps 3 people
12 F150
Overland Park Ks
Hillsdale Lake, KS
Re: Lower unit off time to order the new one
What was the original problem? I have spent some time in that type of lower unit. There is really not a lot in there but every part is big buck$.
Pulling the power head is not really that big a deal. I am not sure what the difference is in the shift shaft tho.
Are you converting from "turn" to "up and down" like the guy with the 50 (adjusting nut in the shaft)
I imagine that is more than just a shaft.
Pulling the power head is not really that big a deal. I am not sure what the difference is in the shift shaft tho.
Are you converting from "turn" to "up and down" like the guy with the 50 (adjusting nut in the shaft)
I imagine that is more than just a shaft.
1974 Harris
70 HP 4 stroke EFI Yamaha
70 HP 4 stroke EFI Yamaha
Re: Lower unit off time to order the new one
I wish I knew more to be able to help you out Curtis. I hope your guy @ the Merc place can get it figured out for you, and get you back down the road .....rrrr wake. 
"Nauti Weasel"
2005 Beachcomber Islander 26
2005 Beachcomber Islander 26
- curtiscapk
- Posts: 5445
- Joined: Mon Nov 10, 2008 8:31 am
- Location: OP KS\Hillsdale Lake
Re: Lower unit off time to order the new one
Ok. Forward Reverse and clutch all worn down
The mechanic stopped added up parts at 900. I checked online and found everything to rebuild lower unit. Gears, seals, and water pump for 750, he will put it together for 250.
I have three choices.
1. Rebuild original lower unit = $1000 bolt right up.
2. Order sei and shift shaft = $1000 and maybe 2 days labor. 3 year warranty
3. Ebay L.U. blown power head looks like new = $550 bolt right up.
what would you do? Money is an issue!
The mechanic stopped added up parts at 900. I checked online and found everything to rebuild lower unit. Gears, seals, and water pump for 750, he will put it together for 250.
I have three choices.
1. Rebuild original lower unit = $1000 bolt right up.
2. Order sei and shift shaft = $1000 and maybe 2 days labor. 3 year warranty
3. Ebay L.U. blown power head looks like new = $550 bolt right up.
what would you do? Money is an issue!
Craig and Paula
"THE FLOATER" rebuild Spring 2013
viewtopic.php?f=2&t=15328
94 Party Barge 24' 115 merc
Turning Point hustler 14 x 13 prop
22mph gps 3 people
12 F150
Overland Park Ks
Hillsdale Lake, KS
"THE FLOATER" rebuild Spring 2013
viewtopic.php?f=2&t=15328
94 Party Barge 24' 115 merc
Turning Point hustler 14 x 13 prop
22mph gps 3 people
12 F150
Overland Park Ks
Hillsdale Lake, KS
